CENTRAL ALABAMA VETERANS ADMINISTRATION HEALTH CARE SYSTEM, TUSKEGEE, ALABAMA

1988-1992

  • Provided over 8 different projects (partial listing)
  • Feasibility Study of HVAC System for 13 Buildings to include Central Chilled and Hot Water Plan System
  • Design of Building 5A
  • Design of Building 4A
  • Buildings 2, 2A, 6, 6A, 9, 13